Pre & Post Termite Treatments
Pre & Post Termite Treatments
Pre-Construction Anti Termite Treatment
If you are planning to build a house or develop your property for building your office, termite control is the first thing you should think of. We use highly professional and advanced techniques for treating the termite infestation problem. Direct liquid treatments are applied to the outside, inside and also in the foundation to eliminate the termites completely. Direct injection of liquid pesticide (termiticide) in areas like the foundation, within the foundation walls and also areas under the concrete slabs is part of our specialized termite control treatment plan.
Post Construction Anti-Termite Treatment (For Existing Buildings)
Treatment To Masonry Foundation (External Side)
- If there is loose soil around the walls of your building, we dig a shovel width trench close to the external wall of the building exposing the foundation wall surface upto a depth of 50cm.
- If there exists a concrete cover or masonry apron around the walls of your building, holes are drilled as close as possible to the plinth wall about 300mm (1ft) apart from each other. Insecticide is then poured, so that it reaches the soil to eliminate the termites present there and to stop them from re-infesting. If your building is on pillars, the holes are drilled around the pillars and insecticide poured into the soil.
Not
sure?
Schedule a Free Inspection
Creepy, but true...
